I’m back from ADAPT and today was my first full day of work in over a week. It was quite the day and every single minute was packed. Very busy and high tension. Nonetheless, there is nothing that is insurmountable. All things are possible.
On the home front, we have a pretty big leak in the bathroom. Thankfully, the leak is only dripping into the bathtub and is not affecting anything structurally. However, it requires shutting off the water (a major inconvenience) . I also uncovered some really poorly repaired drywall. We’re very tight, on the budget front, but we’ll figure out a way to fix it. Hopefully someone can refer me to a qualified and economical repair person. I don’t do drywall.
Other than that, life is still full of stress–related to moving. I feel an air of malaise. Although we’re making headway, a little each day, it’s too slow for my liking. Steph is the engine that keeps everything moving. She has really taken on most of the initiative since we moved in. I’m very proud of her progress and discipline.
Well, that’s about it for now. More updates in the coming weeks. Pics soon…well, not really soon…eventually.